Gwadar Rs200 Million Sanitation Project Launched for Cleaner Future

GAWADAR PORT & FISH HARBOR

The government of Pakistan has launched the Gwadar Rs200 million sanitation project, marking a significant step toward sustainable urban development. As Gwadar continues to grow, its waste management needs have become more urgent. Therefore, this initiative introduces smart sanitation systems using modern technology to tackle the issue effectively.

Why Gwadar Needs a Sanitation Overhaul

Gwadar, which was once a modest coastal town, now generates over 20 tons of solid waste daily, compared to just 5 tons in 2010. The increase stems from rising commercial activity and housing expansion. As a result, open dumping of waste has led to serious health hazards and environmental damage.

What the Rs200 Million Will Fund

The Gwadar Rs200 million sanitation project will fund:

  • Smart waste management systems
  • A modern landfill site
  • High-tech equipment
  • Manual and mechanical waste collection processes
  • Sprinkler and sweeper trucks
  • Sealed public garbage containers

Additionally, door-to-door collection services will be introduced to improve cleanliness across the city.

Smart Waste Collection to Replace Open Dumping

Instead of continuing with unsafe practices, Gwadar will adopt a container-based collection system. Trained collection teams will manage daily operations. Moreover, these sealed containers will reduce exposure to hazardous waste, ensuring better health for local communities.

Turning Biodegradable Waste Into Energy

One of the most innovative features of the Gwadar Rs200 million sanitation project is its use of anaerobic fermentation. This method transforms organic waste into biogas and decomposed manure. Not only does this reduce greenhouse gases, but it also promotes the use of clean energy and generates carbon credits.

National Impact of Recycling in Pakistan

Across Pakistan, only 50% of generated waste is currently collected. Fortunately, recycling offers a solution. It helps conserve resources, minimizes landfill use, and supports a circular economy. The Gwadar initiative sets an inspiring example for other cities.

Gwadar’s Smart Sanitation System Under CPEC

Since this project falls under the CPEC framework, it has received approval from the PSDP and Central Development Working Party. GDA Director General Saif Ullah Khaithran confirmed that detailed feasibility studies and PC-1 formulation are already complete. Furthermore, he stated that Gwadar’s waste will be managed using state-of-the-art SOPs and modern tools.

A Model for Clean, Green Urban Planning

This initiative does more than improve waste disposal. It introduces smart, efficient, and environmentally responsible systems. Thus, Gwadar is being positioned as a role model for other urban centers in Pakistan.

Final Thoughts

In conclusion, the Gwadar Rs200 million sanitation project goes far beyond basic waste removal. It brings smart waste management, energy production, and eco-conscious urban planning into one well-structured solution. Gwadar is now on the path to becoming a cleaner, greener city — one step at a time.

For more news and updates, please visit PFM Today.

Share this article

Leave a Reply

Your email address will not be published. Required fields are marked *